For the simple and precise transfer, marking, and boring of mounting positions for any hardware.
Step #1 Bore 20mm holes for front adjusters, insert marking gauges into drawer front.
Step #2 Align the drawer front to make marks in the drawer box.
Step #3 Mark fixing positions with light tab on the drawer front.
Step #4 Drill 5mm (3/16″) holes to the drawer box.
Step #5 Insert drawer adjusters manually using a hammer.
Step #6 Install and adjust drawer front.
Reviews
There are no reviews yet.